





Bedford Village - Phase Three
Manshield Construction is currently under construction of Bedford Village Phase 3 for Christenson Developments.
This 5 storey building is non combustible and built with light weight steel load bearing steel stud walls and the Hambro D-500 floor system
Main Floor will house assisted living & commercial retail units and the building under construction will be tied into a Phase 2 which is a wood structure.
Specs
-
Client:Christenson Developments
-
Project Location:Sherwood Park, Alberta
-
Sector:Residential - Multi-Tenant
-
Role:General Construction - Design Assist
-
Constructed in:2016
-
Project Schedule:18 Months
-
Budget:$12.78 Million